home *** CD-ROM | disk | FTP | other *** search
/ Software Vault: The Gold Collection / Software Vault - The Gold Collection (American Databankers) (1993).ISO / cdr33 / mvsinst.zip / INSPLN.044 (.png) < prev    next >
IBM Storyboard PIC  |  1993-04-01  |  37KB  |  640x480  |  4-bit (4 colors)
Labels: bulletin board | hakham | sky | web site
OCR: Functional and Stress Testing Test as much as you can: The goal of testing to try to make the systerm fail now doesn't fail during production. Load the System during testing: The most effective tests load the system least the highest level expected production, using all the functions your applications require You C Use load simulators such as TPNS Ask users and applications people to come in and help you test. Isolate the testing environment from the production environment as much AS possible (for example use an LPAR VM Guest and separate DASD) Dedicated machine time you test by scheduling dedicated machine time, you should have contingency plan allowing enough time for recover